Concrete Repair & Crack Stitching

The fastest way to fail a resin floor is to install it over poor concrete. We rebuild substrates so an epoxy or PU floor can perform for its full life.

Concrete Repair & Crack Stitching — Qatar & UAE
System overview

What you get

The fastest way to fail a resin floor is to install it over poor concrete. Our concrete repair service rebuilds substrates so an epoxy or PU floor can perform for its full life — crack stitching, joint reinstatement, screed bedding and repair mortars to BS EN 1504.

  • Static crack stitching with stainless staples + epoxy injection
  • Saw-cut control joint reinstatement with PU caulk
  • Cementitious repair mortars (R3 / R4 grade per BS EN 1504-3)
  • Self-levelling latex screed bedding for new resin overlays
Request a Quote →
When concrete needs help

Common Gulf substrate problems we fix.

⚠️

Random Cracking

Differential settlement, drying shrinkage. Stitched, injected and overcoated.

🚪

Joint Spalling

Lifted joint edges from forklift impact. Cut back, repaired with PU caulk or rapid-setting mortar.

💧

Rising Damp

Underground water table failure. Vapour-barrier primer + breathable system spec.

🌊

Slab Curl & Wave

Diamond grinding to plane, then self-levelling latex bedding.

🔥

Burnt-In Oil

Mechanical removal + degreasing, sealed with isolation primer before resin.

🪨

Old Tile / Topping

Mechanical strip-out, primer, then resurface with new screed and resin.

FAQ

Common questions

Do you do epoxy injection of structural cracks?

Yes — low-viscosity epoxy injection through bonded ports, on cracks above 0.3 mm. We follow ACI 224 and BS EN 1504-5. Stainless staples added across active cracks for crack-bridging.

Can you eliminate rising damp before installing the floor?

We can manage it — solvent-free epoxy vapour-barrier primer at 0.4 kg/m² blocks RH up to 95%. For higher RH, we strongly recommend addressing drainage at the building level first.

How long after concrete repair before resin can go down?

For cementitious repairs: 7 days minimum drying / curing. Epoxy injection: 24 hours. Latex self-leveller: 24–48 hours. We always moisture-test before starting the resin.

Get a fixed quote in 1 to 2 working days.

Free site visit anywhere in Qatar or the UAE. Tell us a postcode and a rough area — we'll be on-site this week.