HomeIndustries › Healthcare & Pharma Flooring

Healthcare & Pharma Flooring

Healthcare floors must be seamless, antibacterial, low-VOC and easy to disinfect. From OPD to operating theatre or pharma cleanroom — hospital-grade resin systems that pass infection-control inspections.

Healthcare & Pharma Flooring — Qatar & UAE
Sector overview

What this sector demands

Healthcare floors must be seamless, antibacterial, low-VOC and easy to disinfect. From a clinic OPD to an operating theatre or pharma cleanroom, we install hospital-grade resin systems that pass infection-control inspections in DHA, MOH UAE, MOPH Qatar and JCI-accredited facilities.

  • Seamless 2 mm epoxy or PU with antibacterial silver-ion additive
  • Low-VOC, low-odour formulations — work in occupied wings
  • Conductive ESD grade for OT and MRI rooms (10⁴–10⁹ Ω)
  • Integral coving, hygienic wall coatings, sealed drain detail
Get a Quote →
Healthcare zones

Specialist systems by clinical area.

ZoneSystemSpecial features
OT & ICU3 mm conductive ESD epoxy10⁶ Ω, copper grounding strips
Wards & corridors2 mm antibacterial epoxyCoving, silver-ion additive
OPD & reception1.5 mm decorative epoxyBranded colours, easy clean
Pharmacy & lab3 mm chemical-resistant epoxyAcid & reagent resistant
Pharma cleanroom3 mm low-VOC PUEU GMP grade, ISO 14644
Sterile services dept4 mm PU mortarSteam wash, 80°C resistant
FAQ

Common questions

Can you work in an occupied hospital?

Yes — we use low-VOC / low-odour systems and zone work room-by-room with negative-pressure containment. Recent project: 6,000 sqm hospital wing in Abu Dhabi re-floored over 8 weekends with no ward closure.

What does antibacterial additive add?

Silver-ion antibacterial additive (SteriTouch / BioCote class) reduces surface bacterial growth by 99%+ in 24 hours per ISO 22196. Embedded in resin — not a topical coat — so it works for the floor's life.

Is the floor conductive enough for OT use?

Yes — we specify conductive ESD epoxy at 10⁴–10⁶ Ω for OT and MRI rooms, with copper grounding strips bonded to the building earth. Hand-over includes a stamped resistivity test report.

Get a fixed quote in 1 to 2 working days.

Free site visit anywhere in Qatar or the UAE. Tell us a postcode and a rough area — we'll be on-site this week.

💬 Quote on WhatsApp